The opportunities for use of the WAS cutting process in industry are many and varied. We can find a tailored, cost-effective solution for your problem also.
| Customer | Short description | In the facility of |
| | | |
| ABB Automation Products | Cutting of plate edges on a 16 ton weighing machine – with extremely limited build space | |
| Alceru Schwarza | Parting of pipework contaminated with a polymer solution | |
| Bauer Spezialtiefbau (Bauer Specialist Foundation Engineering) | Cutting of tie rods at a depth of 30 m from inside to outside (internal diameter = 40 mm) | |
| dwt | Dismantling of steel tanks with internal fireclay coating | BASF |
| Eckelmann | Dividing up of copper slag | Norddeutsche Affinerie |
| FG Industrial Access and Maintenance Services | Cutting tasks on a elevated flare pipe | MIDER / Leuna |
| JPM Ingenieurtechnik (JPM Engineering) | Assembly opening (3.5 x 3.5 m) in steel tank with solid residues (> 1 m from the tank floor) | |
| MCE Voest VEA | Dismantling of two floating tank covers | MIDER / Leuna |
| MTU Aero Engines | Cutting up of a titanium aluminide blank | |
| OCHS Bohrgesellschaft | Dismantling of a well | |
| Permatech | Dismantling of double-walled tanks | BASF |
| Rheinmetall W&M | Cut-outs on an armoured vehicle | |
| RUAG | Cutting tasks on the prototype of the Genie tank | |
| Südzucker | Core holes in the reactor | |
| vom hagen mce | Pipework cutting tasks (vertical and horizontal) – internal surface contaminated with a layer of coke | MIRO |
| MCE Voest VEA GmbH, Leuna | Cutting of welded lip seals on reactors and heat exchangers | Total Raffinerie, Leuna |
| CRECUS Carl Robert Eckelmann Cleaning u. Service GmbH, Hamburg | Cutting a filled crude oil tank. Removing the cover | Vopak, Hamburg |
| CRECUS Carl Robert Eckelmann Cleaning u. Service GmbH, Hamburg | Cutting of pipes filled with gas/piped product | Raffinerie Wilhelmshaven |
| Goldtech Technologies LTD., Israel | Demolition of distillation towers in Haifu | Oil Refineries Ltd., Israel |
| Thyssen-Krupp Xervon, branch Lingen | Cutting of pipes | Oil Refineries Emsland |
| Scandinavisk Industrieservice A/S, Ringsted, Denmark | Cutting of an installation opening measuring 4 x 4 m in a floating-roof tank | Statoil, Kalundborg, Denmark |
| BMA Braunschweiger Maschinenbau Anstalten AG | Separation and dismantling of toothed rings from two extraction towers | Nordzucker, Uelzen |
| H. & J. Brüggen KG, Lübeck | Cutting of an underwater through-hole in the harbour wall | LHG Lübecker Hafen-Gesellschaft mbH |
ANT is the right contact also for specialised applications of the WAS cutting process such as, for example, for the OCHS Bohrgesellschaft mbH (OCHS Drillling Company Ltd) in Nuremberg. More about this project.
A further example is provided by the applications made by the company Josef Meissner GmbH & Co., Cologne. The company uses the AMU 700-20 for opening up barrels, as well for cutting up the contents of a GEKA inertisation plant in Munster. The equipment has been combined with a 4-axis servo-manipulator. ...more