e-on (nuclear power station Würgassen)For the company „e-on“ we carried out the following order in the nuclear power station of Würgassen 
System special mini MACE / 450 bar WAS system incl. hand-held gun 
ApplicationCutting and decontamination of "hot-spots" 
CompletionMay 2003 

 | |  |  WAS system incl. remote control (25 m)
|  |  Hand-held gun with (1) high pressure hose, (2) transponder for save operation and (3) high pressure tube incl. cutting nozzle
|
|

Technical details of our product mini MACE 
|